Knauf has supplied flooring and insulation products to ZedFactory for its prototype LivShare, a multi-occupancy housing solution to address Britain’s housing crisis which is being assembled at an Essex college before making its way to the Futurebuild exhibition on 5-7 March 2019.
Lead architect Bill Dunster OBE chose to specify Knauf GIFAfloor FHB; Knauf Insulation Earthwool Flexible Slab (140mm on external walls); and Knauf Insulation Earthwool Rainscreen Slab (140mm on external walls and 100mm on internal walls).